ONW Procedure Video
Our first video project was a simple one designed to let us take the new video cameras for a test drive. Mine turned out awful. Three months out of practice, I was unable to spit out something I'm proud of. We decided to show the students how to be the best Raven ever.
We came up with a list of FIVE need-to-know items about ONW:
Secret shortcuts between hallways
Bathroom that almost no one uses
Out of the way staircases
The auditorium
Special drinking fountains for bottles
We didn't really storyboard at all, besides listing those five musicians-haves on paper. I was the camera man, though, and we managed to get a hold of the school mascot hat. We filmed all of our scenes in the span of 80 minutes, ending up with about 5 minutes of footage. Unfortunately, we got hit with the 30 seconds-only rule. So we lost over half of our clips.
We edited our own clips, and mine turned out alright, I guess. I definitely could have done better if there wasn't a time restriction. I would've made better transitions, an easier to follow flow, and actual audio. I did like all of the shots we got, though, so I'd keep those.
Honestly, for the next project, I hope we get to pick our groups. I feel I could do a lot more with people I've worked with extensively before.
No comments:
Post a Comment